Low current (ELV) for villas, homes and residential buildings in Kuwait

Every low current system in a home, and when each one goes in during construction, room by room and cable by cable.

Reviewed by Eng. M. Ahmed, Team Leader, Network & Project SpecialistUpdated

The low current (ELV) package of a villa or home in Kuwait is every system that carries internet, video and sound rather than power: network points and Wi-Fi, cameras, the gate intercom, phones, TV points, ceiling speakers and the smart home. Its conduits go in before plastering, its cables after plastering, and the devices last.

UltraTech Kuwait plans, cables and installs low current systems for villas, homes and residential buildings in all areas of Kuwait. The best time for the visit is the grey-structure stage, before the walls are closed.

A typical villa: basement + 3 floors + roof annex

5
Access points
6
Outdoor cameras
1
Gate intercom
4
IP phones
23
Cable points to the cabinet

The villa planner's example: the second floor is an apartment, one gate and parking.

What does the low current package of a villa include?

The network (at least one point in every room), a ceiling access point on each floor, outdoor cameras on the gates, parking and sides, the gate intercom, IP phones between rooms, TV points, ceiling speakers and the smart home cabling. All of it runs back to one cabinet.

Fire alarm is not part of the low current work we do; it belongs to an approved fire contractor.

When does the low current go in during construction?

In three stages: conduits and back boxes at the grey-structure stage before plastering, cables after plastering and before painting, and devices last, after paint and flooring. Skip the first stage and walls get opened later.

So the visit should happen while the house is still a grey structure. The engineer marks every point on the drawing and on the wall, together with the electrical contractor.

How we work with your electrician from drawing to handover: Wi-Fi, cameras and intercom for new villas.

How many points does each room need?

At least one network point in every room; the final number is your choice. The table below is what we recommend for a typical Kuwaiti villa.

WherePointsWhy
Majlis and diwaniyaNetwork + TV + phone + speakersA big screen, guests and sound
Living roomNetwork + TV + speakersThe TV on a cable, not on Wi-Fi
BedroomsNetwork + TVA point beside the TV position
Kitchen and maid's roomPhoneAn internal phone to call between rooms
Ceiling of each floorAccess pointA whole floor on one cable
Gates, parking and sidesCameras + gate intercomOutdoor cameras and a bell that rings the phone
RoofCable for an outdoor 5G unitA stronger signal than indoors

Count the devices for your house with the villa network planner.

Which conduits and boxes for low current?

A 25 mm conduit to each point and 32 mm for runs that carry several cables, always apart from the power conduits and with a pull wire. A back box for each point at the same height as the power sockets, and a ceiling box for each access point and speaker.

A data cable sharing a conduit with a power cable picks up interference in the picture and the sound. Tight bends make the cable hard to pull and damage it.

Which cable for each system?

Cat6 for everything on the network: computers, TVs, access points, cameras, the intercom and phones. RG6 coax for satellite TV points. Speaker cable for the ceiling speakers. Every cable runs back to the cabinet.

SystemCableRuns back to
Network and access pointsCat6The cabinet switch
Cameras, intercom and phonesCat6 (powered through the cable)The PoE switch in the cabinet
Satellite TVRG6 coaxThe satellite multiswitch
Ceiling speakersSpeaker cableThe amplifier in the cabinet
5G unit on the roofOutdoor Cat6The router in the cabinet

Where does the low current cabinet go in a villa?

Somewhere central, ventilated and with a socket on a UPS: a small room, under the stairs or a store, never in the kitchen or next to a bathroom. Every cable in the house ends there, so every conduit has to reach it.

For what goes inside and how big the UPS is, see the home cabinet and UPS.

Satellite or IPTV for the TV points?

In a new build, both: coax for satellite and Cat6 for apps and IPTV at every TV point. Whichever you choose later then works without new cabling.

Satellite needs a dish on the roof and a multiswitch in the cabinet that feeds every room.

Do ceiling speakers have to go in during construction?

Their ceiling boxes and cable conduits do. The usual places are the majlis, the diwaniya, the living room and the garden, each area with its own sound from an amplifier in the cabinet or from a phone.

What does a smart home need before cabling?

A decision before the electrics: most wireless smart switches need a neutral wire in the switch box, and wired systems such as KNX need a cable from every switch to the panel. If it is not decided yet, leave a neutral in every switch box.

Smart curtains, lighting and air conditioning all run on the home network, so an access point on every floor matters for them too.

What about cameras, locks and the gate motor?

The example villa has 6 outdoor cameras on an 8-channel recorder and one gate intercom that rings the phone. Smart locks, the gate motor and door access readers need a cable or a conduit to their position from the start.

More on cameras for homes, door access readers and home intercom and phones.

And an apartment building?

The same systems, laid out differently: a cable to each apartment from a ground-floor cabinet, Wi-Fi inside each apartment, cameras on the shared areas only, and an entrance panel that rings every apartment.

See internet and cameras for residential buildings.

Can low current be added to a finished house?

Yes, with more work: cables run above false ceilings, in shafts and in trunking on the wall, and cameras and access points take their cable from the nearest route. The Wi-Fi still goes on cables; mesh only where no cable can reach.

See network setup for a finished home.

How much does the low current of a villa cost?

It depends on the floors, the rooms and the systems you choose, so we don't price it before seeing the drawing or the house. It starts with a site visit, then a layout and a quotation. Home technical visits: Site visits are free in most areas of Kuwait. Distant areas have a location-based fee; select your area to see the exact fee before booking. Any paid visit fee is deducted from your final invoice if you go ahead with us.

Quote requests are reviewed by a person and answered within 4-8 working hours.

Per-point installation prices and the warranty are on the installation and warranty page.

How does a villa's low current work run?

Six steps from grey structure to handover. Delivery and installation start within 2–3 days after the 50% advance is cleared. Project completion time depends on the scope and requirements.

  1. 1Visit at grey structureThe engineer walks the house with the drawing and agrees the routes with the electrical contractor.
  2. 2Point layoutEvery point in every room, an access point per floor, the cameras and the cabinet.
  3. 3Conduits and boxesBefore plastering, every conduit to the cabinet with a pull wire.
  4. 4CablesAfter plastering, every cable labelled at both ends and tested.
  5. 5DevicesAfter painting: the cabinet, switch, recorder, access points, cameras and intercom.
  6. 6HandoverWi-Fi measured on every floor, each camera checked by day and night, the passwords, and a 1-year hardware warranty.

What this is based on

This order comes from how villas are built in Kuwait: concrete walls and slabs, an electrical contractor who lays conduits at the grey-structure stage, and households mostly on 5G. The numbers are a starting point that the engineer confirms at the visit. Our projects · Reviewed by Eng. M. Ahmed

Related

Is your house at grey structure?

Home technical visits: Site visits are free in most areas of Kuwait. Distant areas have a location-based fee; select your area to see the exact fee before booking. Any paid visit fee is deducted from your final invoice if you go ahead with us. Quote requests are reviewed by a person and answered within 4-8 working hours.

For company buildings, see ELV and smart building systems and public address and audio.